A platform for research: civil engineering, architecture and urbanism
Environmental Assessment Wing Infrastructure Development Outlook (WINDO) for Cannon AFB, New Mexico
This Environmental Assessment (EA) analyzes the potential environmental consequences of the proposal to implement the Wing Infrastructure Development Outlook (WINDO) for Cannon Air Force Base (AFB). The WINDO identifies engineering projects proposed to improve the infrastructure of Cannon AFB. The EA has been prepared in accordance with the National Environmental Policy Act (NEPA) and its implementing regulations. The Draft EA was issued for public and agency review and comment. Comments on the Draft EA have been incorporated into this Final EA. These comments, in addition to the analyses presented in this document, will guide the decision regarding the Cannon WINDO proposal. Specific Cannon AFB projects analyzed in this EA are: Demolition of Abandoned Taxiway; Construction of Entomology Shop; Construction of Aerospace Ground Equipment Complex; Construction of Dining Hall/Airman's Center; Construction of Communications Facility; Construction of Base Library/Education Center; Construction of Fitness Center; Construction of Transportation Complex; Construction of Civil Engineering Pavements and Equipment Shop; Construction of Lodging Office/Distinguished Visitor Suites; Construction of Raw Water Distribution System; Construction of Fill Stands. Specific MAFR projects analyzed in this EA are: Construction of Range Control Building at MAFR; Renovation of Fire Station 3 at MAFR; Construction of Range Control Tower at MAFR.
Environmental Assessment Wing Infrastructure Development Outlook (WINDO) for Cannon AFB, New Mexico
This Environmental Assessment (EA) analyzes the potential environmental consequences of the proposal to implement the Wing Infrastructure Development Outlook (WINDO) for Cannon Air Force Base (AFB). The WINDO identifies engineering projects proposed to improve the infrastructure of Cannon AFB. The EA has been prepared in accordance with the National Environmental Policy Act (NEPA) and its implementing regulations. The Draft EA was issued for public and agency review and comment. Comments on the Draft EA have been incorporated into this Final EA. These comments, in addition to the analyses presented in this document, will guide the decision regarding the Cannon WINDO proposal. Specific Cannon AFB projects analyzed in this EA are: Demolition of Abandoned Taxiway; Construction of Entomology Shop; Construction of Aerospace Ground Equipment Complex; Construction of Dining Hall/Airman's Center; Construction of Communications Facility; Construction of Base Library/Education Center; Construction of Fitness Center; Construction of Transportation Complex; Construction of Civil Engineering Pavements and Equipment Shop; Construction of Lodging Office/Distinguished Visitor Suites; Construction of Raw Water Distribution System; Construction of Fill Stands. Specific MAFR projects analyzed in this EA are: Construction of Range Control Building at MAFR; Renovation of Fire Station 3 at MAFR; Construction of Range Control Tower at MAFR.
Environmental Assessment Wing Infrastructure Development Outlook (WINDO) for Cannon AFB, New Mexico
2004
122 pages
Report
No indication
English
Environmental Pollution & Control , Environmental impact , Air force facilities , Civil engineering , Environmental assessment , Structural engineering , Demolition , Pavements , Air quality , Pollution abatement , Water quality , Noise pollution , Infrastructure , Dining halls , Bases(Structures) , Communications centrals , Water supplies , Water distribution , Shops(Work areas) , Libraries , Runways , Environmental protection , Waste management , Safety , Construction , Airport control towers , Windo(Wing infrastructure development outlook) , Cannon air force base , Final environmental assessment
Public Development and Infrastructure Outlook
British Library Online Contents | 2013
|British Library Online Contents | 2016
British Library Online Contents | 2010