A platform for research: civil engineering, architecture and urbanism
The disassembly of an MITG Test Article is described in this document. The test article consisted of a complete slice through an MITG, an electric heater, eight standard silicon germanium multicouples, a foil insulation pack, and an aluminum housing. This constitutes a test article assembly. The details of this hardware have been described elsewhere. A similar test article containing eight GaP doped multicouples was also tested. The details of this disassembly are presented in a separate document. Only the Station 1 builds (standard SiGe) will be discussed in this document.
The disassembly of an MITG Test Article is described in this document. The test article consisted of a complete slice through an MITG, an electric heater, eight standard silicon germanium multicouples, a foil insulation pack, and an aluminum housing. This constitutes a test article assembly. The details of this hardware have been described elsewhere. A similar test article containing eight GaP doped multicouples was also tested. The details of this disassembly are presented in a separate document. Only the Station 1 builds (standard SiGe) will be discussed in this document.
MITG Station 1 Build 1 and Build 2 Disassembly
1982
82 pages
Report
No indication
English
MITG Station 2, Build 1 Disassembly
NTIS | 1982
|NTIS | 2016
|TIBKAT | 1981
How to build filling station driveways
Engineering Index Backfile | 1929
Online Contents | 2012
|