A platform for research: civil engineering, architecture and urbanism
Production and Costs of Manual Delimbing, Bucking, and Piling in Thinnings
Studies were made of chainsaw delimbing and bucking with manual piling of bunched trees to determine productivity rates and costs for each function. Information was obtained from observations of six thinning operations in the South. Average d.b.h. and bolt length significantly affected total delimbing and bucking time per tree. Manual piling time was dependent on average d.b.h. and stems per bunch.
Production and Costs of Manual Delimbing, Bucking, and Piling in Thinnings
Studies were made of chainsaw delimbing and bucking with manual piling of bunched trees to determine productivity rates and costs for each function. Information was obtained from observations of six thinning operations in the South. Average d.b.h. and bolt length significantly affected total delimbing and bucking time per tree. Manual piling time was dependent on average d.b.h. and stems per bunch.
Production and Costs of Manual Delimbing, Bucking, and Piling in Thinnings
B. J. Stokes (author) / B. L. Lanford (author)
1986
12 pages
Report
No indication
English
Forestry , Operating costs , Pine trees , Structural timber , Equipment , Harvesting , Saws , Wood , Sawing , Stacking , Thinning , Delimbing
Concrete piling halves foundation costs
Engineering Index Backfile | 1954
|USS steel sheet piling design manual
UB Braunschweig | 1975
|Thinnings work in Westonbirt woods
Online Contents | 1994
Online Contents | 2014
|