Sargent Beach, Texas: A Study of Logistical Constructability Issues on a Large Project
This thesis presents an analysis of the logistical constructability issues identified for the Sargent Beach, Texas, Shoreline Protection Project. The U.S. Army Corps of Engineers, Galveston District recognized the advantages of employing constructability concepts and agreed to establish a relationship with the Construction Industry Institute (CII) in order to achieve a constructability study on this project. By incorporating construction knowledge and experience early in the planning and design phase, the District felt that it could significantly enhance overall project success. Constructability concepts have been shown to decrease project duration, maximize construction efficiency, and optimize overall cost. This thesis was developed in conjunction with the CII study and concentrates on the logistical aspects of the project to include, construction materials, transportation and handling, and work site operations. In addition, a research methodology is outlined to assist future, similar studies in the area of logistical constructability issues. Conclusions and recommendations are presented based on the results of the analysis.
Sargent Beach, Texas: A Study of Logistical Constructability Issues on a Large Project
This thesis presents an analysis of the logistical constructability issues identified for the Sargent Beach, Texas, Shoreline Protection Project. The U.S. Army Corps of Engineers, Galveston District recognized the advantages of employing constructability concepts and agreed to establish a relationship with the Construction Industry Institute (CII) in order to achieve a constructability study on this project. By incorporating construction knowledge and experience early in the planning and design phase, the District felt that it could significantly enhance overall project success. Constructability concepts have been shown to decrease project duration, maximize construction efficiency, and optimize overall cost. This thesis was developed in conjunction with the CII study and concentrates on the logistical aspects of the project to include, construction materials, transportation and handling, and work site operations. In addition, a research methodology is outlined to assist future, similar studies in the area of logistical constructability issues. Conclusions and recommendations are presented based on the results of the analysis.
Sargent Beach, Texas: A Study of Logistical Constructability Issues on a Large Project
J. E. Wood (author)
1993
144 pages
Report
No indication
English
Ocean Sciences & Technology , Civil Engineering , Construction , Shore protection , Pile structures , Coastal engineering , Army Corps of Engineers , Beaches , Construction materials , Costs , Efficiency , Handling , Texas , Theses , Transportation , Concrete , Precast concrete , Excavation , Sargent Beach(Texas) , Geotextiles
Revetment Stability Tests for Sargent Beach, Texas
NTIS | 1993
|Recreational Planning for Revetment at Sargent Beach, Texas: "Turning a Lemon to Lemonade"
British Library Conference Proceedings | 1998
|Constructability issues in Indonesian construction
British Library Conference Proceedings | 2001
|Constructability : a tool for project management
TIBKAT | 2019
|