A platform for research: civil engineering, architecture and urbanism
EEAP Boiler and Chiller Study II at Fort Sam Houston, Texas, Volume 1
The purpose of the study was to perform a limited site survey of specific buildings at the facility, identify specific Energy Conservation Opportunities (ECOs) that exist, and then evaluate these ECOs for technical and economic feasibility. These ECOs were limited to central boiler and chiller plant systems serving specific building groups at FSH. This study is the second phase of a Boiler/Chiller study completed by Huitt-Zollars, Inc. for The Corp of Engineers on September 18, 1995. In addition to the work that was accomplished in that project, additional buildings for three of the areas analyzed previously and two new areas have been added to the Scope of Work for this phase. Therefore, much of the same data that was gathered for the first phase will again be used in this second phase to identify ECO's.
EEAP Boiler and Chiller Study II at Fort Sam Houston, Texas, Volume 1
The purpose of the study was to perform a limited site survey of specific buildings at the facility, identify specific Energy Conservation Opportunities (ECOs) that exist, and then evaluate these ECOs for technical and economic feasibility. These ECOs were limited to central boiler and chiller plant systems serving specific building groups at FSH. This study is the second phase of a Boiler/Chiller study completed by Huitt-Zollars, Inc. for The Corp of Engineers on September 18, 1995. In addition to the work that was accomplished in that project, additional buildings for three of the areas analyzed previously and two new areas have been added to the Scope of Work for this phase. Therefore, much of the same data that was gathered for the first phase will again be used in this second phase to identify ECO's.
EEAP Boiler and Chiller Study II at Fort Sam Houston, Texas, Volume 1
1996
14 pages
Report
No indication
English