A platform for research: civil engineering, architecture and urbanism
Inspections of Previously Monitored Coastal Structures
This report presents results of inspections of coastal structures monitored previously under the Monitoring Completed Navigation Projects (MCNP) Program. Expedient, low-cost inspections consisting of walking inspections and/ or boat surveys were performed at 14 sites. Positions of breakwater and jetty armor units were compared with their positions in previous aerial photography and photogrammetric surveys. Settlement of portions of the structures as well as voids in their armor also were noted, and photographs of the structures were obtained. Summaries of the inspection results as well as recommendations are presented in this report. The work was conducted under the 'Periodic Inspections' work unit of the MCNP program.
Inspections of Previously Monitored Coastal Structures
This report presents results of inspections of coastal structures monitored previously under the Monitoring Completed Navigation Projects (MCNP) Program. Expedient, low-cost inspections consisting of walking inspections and/ or boat surveys were performed at 14 sites. Positions of breakwater and jetty armor units were compared with their positions in previous aerial photography and photogrammetric surveys. Settlement of portions of the structures as well as voids in their armor also were noted, and photographs of the structures were obtained. Summaries of the inspection results as well as recommendations are presented in this report. The work was conducted under the 'Periodic Inspections' work unit of the MCNP program.
Inspections of Previously Monitored Coastal Structures
R. R. Bottin (author) / L. R. Tolliver (author)
1999
61 pages
Report
No indication
English
Integrating Valve Inspections with Pipeline Inspections
TIBKAT | 2021
|