A platform for research: civil engineering, architecture and urbanism
Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee
Arnold Air Force Base (Arnold AFB) has prepared an Environmental Assessment (EA) (February 2006) that evaluates the potential environmental and socioeconomic impacts associated with demolition of 14 facilities within Arnold AFB. This EA is incorporated by reference into this finding. Description of the Proposed Action. The Proposed Action consists of the demolition of 14 facilities (buildings) and other general demolition activities within the Arnold Engineering Development Center (AEDC) complex. This includes a survey and identification of any hazardous materials at existing facilities to be demolished. Demolition of these facilities would include asbestos and lead-based paint removal, hazardous waste disposal, utilities capping and grounds restoration.
Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee
Arnold Air Force Base (Arnold AFB) has prepared an Environmental Assessment (EA) (February 2006) that evaluates the potential environmental and socioeconomic impacts associated with demolition of 14 facilities within Arnold AFB. This EA is incorporated by reference into this finding. Description of the Proposed Action. The Proposed Action consists of the demolition of 14 facilities (buildings) and other general demolition activities within the Arnold Engineering Development Center (AEDC) complex. This includes a survey and identification of any hazardous materials at existing facilities to be demolished. Demolition of these facilities would include asbestos and lead-based paint removal, hazardous waste disposal, utilities capping and grounds restoration.
Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee
2006
77 pages
Report
No indication
English