A platform for research: civil engineering, architecture and urbanism
Construction-Site Noise Control Cost-Benefit Estimating Procedures
This report aids the U.S. Army Corps of Engineers construction cost estimator in determining the level of noise generated at construction sites, in comparing this level with Corps of Engineers criteria, and in estimating costs to a contractor of reducing the noise. A companion report, Construction-Site Noise Control-Cost-Benefit Estimation Technical Background, Technical Report N-37 (U.S. Army Construction Engineering Research Laboratory (CERL), January 1978), contains the rationale and data supporting this report. (Author)
Construction-Site Noise Control Cost-Benefit Estimating Procedures
This report aids the U.S. Army Corps of Engineers construction cost estimator in determining the level of noise generated at construction sites, in comparing this level with Corps of Engineers criteria, and in estimating costs to a contractor of reducing the noise. A companion report, Construction-Site Noise Control-Cost-Benefit Estimation Technical Background, Technical Report N-37 (U.S. Army Construction Engineering Research Laboratory (CERL), January 1978), contains the rationale and data supporting this report. (Author)
Construction-Site Noise Control Cost-Benefit Estimating Procedures
F. M. Kessler (author) / P. D. Schomer (author) / R. C. Chanaud (author) / R. Rosendahl (author)
1978
35 pages
Report
No indication
English
Construction Equipment, Materials, & Supplies , Noise Pollution & Control , Noise reduction , Cost estimates , Construction equipment , Sound pressure , Barriers , Specifications , Sites , Backfills , Trenching , Earth handling equipment , Substitutes , Foundations(Structures) , Modification , Concrete , Plywood , Noise pollution
Construction Cost Estimating and Control
ASCE | 2021
Engineering Index Backfile | 1926
|Taylor & Francis Verlag | 1985
|Estimating and cost control in elektrical construction design
TIBKAT | 1978
|