A platform for research: civil engineering, architecture and urbanism
Daylight case study building. A working document of Task 21. Daylight in buildings
This report describes 16 buildings, that have been selected as Task 21 case studies. Totally 15 buildings will be monitored and described according to the procedures developed in Task 21. One case study building is in design stage, the new ISE Headquarters in Freiburg, and this project has been selected as a case study on building design. The monitoring programme for the buildings runs through 1997 until mid 1998. The present document serves as a basic document describing the case studies, until the projects will be described in more detail, including monitoring results, towards the end of the Task. (au)
Daylight case study building. A working document of Task 21. Daylight in buildings
This report describes 16 buildings, that have been selected as Task 21 case studies. Totally 15 buildings will be monitored and described according to the procedures developed in Task 21. One case study building is in design stage, the new ISE Headquarters in Freiburg, and this project has been selected as a case study on building design. The monitoring programme for the buildings runs through 1997 until mid 1998. The present document serves as a basic document describing the case studies, until the projects will be described in more detail, including monitoring results, towards the end of the Task. (au)
Daylight case study building. A working document of Task 21. Daylight in buildings
P. E. Kristensen (author)
1997
64 pages
Report
No indication
English
IEA Task 21 - Daylight in buildings
British Library Conference Proceedings | 1997
|Daylight Europe: Daylight Design of European Buildings
British Library Conference Proceedings | 1996
|Daylight And Buildings: Architectural Solutions For Enhanced Daylight Utilization
British Library Conference Proceedings | 2001
|UB Braunschweig | 2002
|Designing buildings for daylight
Engineering Index Backfile | 1929
|