A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase 1 Inspection Report
Foss Reservoir Dam is a 1640 foot earthfill dam with a maximum height of 29 feet. Although the dam is in good condition, the spillway will not pass the peak test flood outflow without overtopping the dam. The dam has been classified in the intermediate size and high hazard categories. It is recommended that the owner employ a registered professional engineer to conduct a more detailed hydraulic and hydrological study.
National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase 1 Inspection Report
Foss Reservoir Dam is a 1640 foot earthfill dam with a maximum height of 29 feet. Although the dam is in good condition, the spillway will not pass the peak test flood outflow without overtopping the dam. The dam has been classified in the intermediate size and high hazard categories. It is recommended that the owner employ a registered professional engineer to conduct a more detailed hydraulic and hydrological study.
National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase 1 Inspection Report
1981
80 pages
Report
No indication
English