Group Efficiencies of Grout-Tipped Drilled Shafts and Jet-Grouted Piles
In current practice, driven piles/drilled shafts are constructed in a group at 3D center to center (c/c) spacing to minimize group interference (i.e., group efficiency factor approx. 1) as well as reduce the cost of the reinforced concrete cap. Presently, group efficiency factors for a number of new foundation types, e.g., post-grouted drilled shafts and jet-grouted piles, are unknown. This research looked into the group interaction of post-grouted drilled shafts and jet-grouted piles at typical 3D spacing. Two sets of group tests for grout-tipped drilled shafts and jet-grouted piles were performed in the Florida Department of Transportation (FDOT) test chamber in medium dense sands. The experimental top down group testing revealed that the jet-grouted piles behaved as a block at 3D spacing, whereas postgrouted drilled shafts acted independently of one another, i.e., no group interaction. A group interaction factor, as well as an analytical approach for predicting load versus displacement for single or group of jet-grouted piles, is suggested. In the case of the grout-tipped drilled shafts, the grout pressure always resulted in an upward flow of grout alongside the shaft which increased both the side and tip areas. The increased areas and grout tip preload were the three factors identified with the increased shaft and group resistance.
Group Efficiencies of Grout-Tipped Drilled Shafts and Jet-Grouted Piles
In current practice, driven piles/drilled shafts are constructed in a group at 3D center to center (c/c) spacing to minimize group interference (i.e., group efficiency factor approx. 1) as well as reduce the cost of the reinforced concrete cap. Presently, group efficiency factors for a number of new foundation types, e.g., post-grouted drilled shafts and jet-grouted piles, are unknown. This research looked into the group interaction of post-grouted drilled shafts and jet-grouted piles at typical 3D spacing. Two sets of group tests for grout-tipped drilled shafts and jet-grouted piles were performed in the Florida Department of Transportation (FDOT) test chamber in medium dense sands. The experimental top down group testing revealed that the jet-grouted piles behaved as a block at 3D spacing, whereas postgrouted drilled shafts acted independently of one another, i.e., no group interaction. A group interaction factor, as well as an analytical approach for predicting load versus displacement for single or group of jet-grouted piles, is suggested. In the case of the grout-tipped drilled shafts, the grout pressure always resulted in an upward flow of grout alongside the shaft which increased both the side and tip areas. The increased areas and grout tip preload were the three factors identified with the increased shaft and group resistance.
Group Efficiencies of Grout-Tipped Drilled Shafts and Jet-Grouted Piles
M. McVay (author) / S. Thiyyakkandi (author) / J. Joiner (author) / V. Adams (author)
2010
206 pages
Report
No indication
English
JFKIA - Post Grouted Drilled Shafts and Driven Piles - Update
British Library Conference Proceedings | 2000
|Lateral Behavior of Post Grouted Drilled Shafts
TIBKAT | 2021
|Performance of Helical Piles with Grouted Shafts
British Library Conference Proceedings | 2000
|Performance of Helical Piles with Grouted Shafts
ASCE | 2000
|Drilled-grouted piles in thick loess in China
British Library Conference Proceedings | 1994
|