A platform for research: civil engineering, architecture and urbanism
This inspection has been conducted under the authority in ER 1110-2- 100, which provides for the 'Periodic Inspection and Continuing Evaluation of Completed Civil Works Structures'. The purpose of the inspection is to examine the physical condition of the Townshend Lake project as part of a continuing program to insure its structural stability, safety, and operational adequacy. The field examination includes soils and geologic aspects of embankments, channels, and other components, as well as structural, concrete, mechanical, electrical, and hydrologic and hydraulic features of the project.
This inspection has been conducted under the authority in ER 1110-2- 100, which provides for the 'Periodic Inspection and Continuing Evaluation of Completed Civil Works Structures'. The purpose of the inspection is to examine the physical condition of the Townshend Lake project as part of a continuing program to insure its structural stability, safety, and operational adequacy. The field examination includes soils and geologic aspects of embankments, channels, and other components, as well as structural, concrete, mechanical, electrical, and hydrologic and hydraulic features of the project.
Townshend Lake: Periodic Inspection Report No. 4 West River Townshend, Vermont
1996
199 pages
Report
No indication
English
Spillway and outlet works, Townshend Dam and Reservoir, West River, Vermont
Engineering Index Backfile | 1959
|Granary Square Townshend Landscape Architects
British Library Online Contents | 2014
Cross the canal to Granary Square - 10 Granary Square - Townshend Landscape Architects
Online Contents | 2014
SPIRITUALITY AND LANDSCAPE - Catherine Townshend contemplates Bligh Voller Nield's ACCC Chapel
Online Contents | 2004
|