A platform for research: civil engineering, architecture and urbanism
Geotechnical Field Data and Analysis Report, July 1989-June 1990. Volume 1
The Geotechnical Field Data and Analysis Report documents the data obtained from geomechanical instruments in the underground at the Waste Isolation Pilot Plant (WIPP). The data are obtained as part of a routine monitoring program and do not include data from tests performed to support performance assessment studies by Sandia National Laboratories, the Scientific Advisor to the project. The purpose for obtaining the geomechanical data is to understand and predict performance of the repository during operations. During the Site and Preliminary Design Validation (SPDV) Program, the Architect/Engineer, for the project, produced quarterly reports to document the geomechanical performance of construction. Since 1987, after the completion of construction, the reports have been prepared annually by the Managing and Operating Contractor for the facility. This report includes data collected up to June 30, 1990, and describes the performance and conditions of selected areas from July 1, 1989, to June 30, 1990. 11 refs., 49 figs., 8 tabs.
Geotechnical Field Data and Analysis Report, July 1989-June 1990. Volume 1
The Geotechnical Field Data and Analysis Report documents the data obtained from geomechanical instruments in the underground at the Waste Isolation Pilot Plant (WIPP). The data are obtained as part of a routine monitoring program and do not include data from tests performed to support performance assessment studies by Sandia National Laboratories, the Scientific Advisor to the project. The purpose for obtaining the geomechanical data is to understand and predict performance of the repository during operations. During the Site and Preliminary Design Validation (SPDV) Program, the Architect/Engineer, for the project, produced quarterly reports to document the geomechanical performance of construction. Since 1987, after the completion of construction, the reports have been prepared annually by the Managing and Operating Contractor for the facility. This report includes data collected up to June 30, 1990, and describes the performance and conditions of selected areas from July 1, 1989, to June 30, 1990. 11 refs., 49 figs., 8 tabs.
Geotechnical Field Data and Analysis Report, July 1989-June 1990. Volume 1
1991
112 pages
Report
No indication
English
Radioactive Wastes & Radioactivity , Geology & Geophysics , Shaft Excavations , WIPP , Technology Assessment , Boreholes , Excavation , Experimental Data , Field Tests , Fractures , Performance , Pilot Plants , Radar , Radioactive Waste Disposal , Support Pillars , Underground Disposal , Tables(data) , Geological surveys , EDB/052002 , EDB/422000