A platform for research: civil engineering, architecture and urbanism
Accelerating transient drainage from UMTRA Project tailings piles
The period between the completion of construction of the tailings disposal cell and the establishment of equilibrium moisture content and seepage conditions is considered to be the period of transient drainage. Transient drainage may be due to factors such as construction water, precipitation, or residual water from the milling process. Transient seepage rates usually exceed steady state seepage rates. If the transient seepage rate causes contaminant levels to exceed groundwater compliance standards, then an alternative groundwater compliance strategy or technical approach to reduce or mitigate the effects of the drainage must be adopted. This study examines methods to accelerate the transient drainage of soils and hence to remove excess pore water from tailings in UMTRA Project disposal cells. The technical and economic feasibility of possible methods is examined. In order to perform comparative economical analyses of the various methods, an example tailings pile is postulated. This pile is considered to be 300 meters by 300 meters by 10 meters in thickness.
Accelerating transient drainage from UMTRA Project tailings piles
The period between the completion of construction of the tailings disposal cell and the establishment of equilibrium moisture content and seepage conditions is considered to be the period of transient drainage. Transient drainage may be due to factors such as construction water, precipitation, or residual water from the milling process. Transient seepage rates usually exceed steady state seepage rates. If the transient seepage rate causes contaminant levels to exceed groundwater compliance standards, then an alternative groundwater compliance strategy or technical approach to reduce or mitigate the effects of the drainage must be adopted. This study examines methods to accelerate the transient drainage of soils and hence to remove excess pore water from tailings in UMTRA Project disposal cells. The technical and economic feasibility of possible methods is examined. In order to perform comparative economical analyses of the various methods, an example tailings pile is postulated. This pile is considered to be 300 meters by 300 meters by 10 meters in thickness.
Accelerating transient drainage from UMTRA Project tailings piles
1990
13 pages
Report
No indication
English
Uranium Mill Tailings Remedial Action (UMTRA) Joint Field Test
British Library Conference Proceedings | 1981
|Geotechnical and Groundwater Site Characterization on the Umtra Project
British Library Conference Proceedings | 1988
|Grouting of Uranium Mill Tailings Piles
NTIS | 1984
|