A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Jennings Pond Dam (CT 00396), Connecticut River Basin, Chester, Connecticut. Phase I Inspection Report
Jennings Pond Dam is a stone masonry and earth embankment structure approximately 115 feet long and 21.5 feet high. The assessment of the dam is based on a visual inspection, past operational performance and hydraulic/hydrologic computations. The dam is judged to be in fair condition with several areas that require attention. The dam is classified as small and has a high hazard potential. The test flood according to these guidelines ranges from 1/2 the PMF to the PMF (Probable Maximum Flood).
National Program for Inspection of Non-Federal Dams. Jennings Pond Dam (CT 00396), Connecticut River Basin, Chester, Connecticut. Phase I Inspection Report
Jennings Pond Dam is a stone masonry and earth embankment structure approximately 115 feet long and 21.5 feet high. The assessment of the dam is based on a visual inspection, past operational performance and hydraulic/hydrologic computations. The dam is judged to be in fair condition with several areas that require attention. The dam is classified as small and has a high hazard potential. The test flood according to these guidelines ranges from 1/2 the PMF to the PMF (Probable Maximum Flood).
National Program for Inspection of Non-Federal Dams. Jennings Pond Dam (CT 00396), Connecticut River Basin, Chester, Connecticut. Phase I Inspection Report
1981
68 pages
Report
No indication
English