A platform for research: civil engineering, architecture and urbanism
Task 3 Dam Assessment Report, Project No. 0-381: SRP (Salt River Project) Coronado Generating Station Evaporation Pond Dam, Apache County, Arizona. Final Report
This Phase I Inspection/Evaluation Report presents the results of a visual dam inspection of the Salt River Project Coronado Generating Station (SRP/CGS) Evaporation Pond Dam located off U.S. Highway 191 in Apache County, Arizona. The inspection was performed on September 9 and 10, 2009 by representatives of GZA GeoEnvironmental, Inc (GZA), accompanied by representatives of SRP/CGS the U.S. Environmental Protection Agency (EPA).
Task 3 Dam Assessment Report, Project No. 0-381: SRP (Salt River Project) Coronado Generating Station Evaporation Pond Dam, Apache County, Arizona. Final Report
This Phase I Inspection/Evaluation Report presents the results of a visual dam inspection of the Salt River Project Coronado Generating Station (SRP/CGS) Evaporation Pond Dam located off U.S. Highway 191 in Apache County, Arizona. The inspection was performed on September 9 and 10, 2009 by representatives of GZA GeoEnvironmental, Inc (GZA), accompanied by representatives of SRP/CGS the U.S. Environmental Protection Agency (EPA).
Task 3 Dam Assessment Report, Project No. 0-381: SRP (Salt River Project) Coronado Generating Station Evaporation Pond Dam, Apache County, Arizona. Final Report
2009
109 pages
Report
No indication
English
Civil Engineering , Hydrology & Limnology , Geology & Geophysics , Administration & Management , Public Administration & Government , Coal Ash Retention Dam , Inspection , Report , Dam safety , Assessment , Federal guidelines , Arizona , Salt River Project(SRP) , SRP Coronado Generating Station , Evaporation Pond Dam , Apache County(Arizona) , Environmental Protection Agency(EPA)
Engineering Index Backfile | 1930
|Mormon flat dam, Salt River Project, Arizona
Engineering Index Backfile | 1930
|