A platform for research: civil engineering, architecture and urbanism
Locks and Dam 1 (Ford Dam), Mississippi River, Draft Feasibility Report and Environmental Assessment for Hydropower
This report presents a detailed evaluation of additional hydropower potential at Locks and Dam 1. An earlier evaluation in a reconnaissance level report (September 1981) indicated preliminary feasibility for added hydropower at this Federal navigation project site. The original Federal navigation locks and dam project included a foundation for a hydropower plant to be developed by non-Federal interests. The existing hydropower plant and equipment are owned and operated by the Ford Motor Company. The existing four turbines generate a combined nameplate capacity of 14.4 MW (megawatts).
Locks and Dam 1 (Ford Dam), Mississippi River, Draft Feasibility Report and Environmental Assessment for Hydropower
This report presents a detailed evaluation of additional hydropower potential at Locks and Dam 1. An earlier evaluation in a reconnaissance level report (September 1981) indicated preliminary feasibility for added hydropower at this Federal navigation project site. The original Federal navigation locks and dam project included a foundation for a hydropower plant to be developed by non-Federal interests. The existing hydropower plant and equipment are owned and operated by the Ford Motor Company. The existing four turbines generate a combined nameplate capacity of 14.4 MW (megawatts).
Locks and Dam 1 (Ford Dam), Mississippi River, Draft Feasibility Report and Environmental Assessment for Hydropower
1984
273 pages
Report
No indication
English
Concreting plant and methods on Mississippi River locks
Engineering Index Backfile | 1935
|Canal and locks at chain of rocks, Mississippi River
Engineering Index Backfile | 1955
|