A platform for research: civil engineering, architecture and urbanism
Long-Term Monitoring of the HPC Charenton Canal Bridge, Technical Summary
The objective of this particular study was to carry out the long-term data collection and analysis for the instrumented Charenton Canal that was first initiated in a previous LTRC study (Final Report 310). The long-term monitoring consisted of collecting data from embedded strain gauges in the deck and four girders of Span 3 of the five-span structure.
Long-Term Monitoring of the HPC Charenton Canal Bridge, Technical Summary
The objective of this particular study was to carry out the long-term data collection and analysis for the instrumented Charenton Canal that was first initiated in a previous LTRC study (Final Report 310). The long-term monitoring consisted of collecting data from embedded strain gauges in the deck and four girders of Span 3 of the five-span structure.
Long-Term Monitoring of the HPC Charenton Canal Bridge, Technical Summary
W. Alaywan (author)
2011
2 pages
Report
No indication
English
Design and Construction of the Charenton Canal Bridge, Charenton, Louisiana
British Library Conference Proceedings | 2000
|Hillsboro Canal Bridge Monitoring, Summary
NTIS | 2011
|Long-Term Monitoring of the HPC Carenton Canal Bridge
NTIS | 2011
|