A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. North Silver Lake Dam (MA 00307), Connecticut River Basin, Sandisfield, Massachusetts. Phase I Inspection Report
North Silver Dam is about 1550 feet long with a maximum height of 76 feet. The dam has a chimney drain and a rock toe for internal drainage. The dam has been classified as intermediate in size with a high hazard potential. The dam is considered to be in fair condition. A major breach of the dam could cause appreciable damage to roads, bridges and residences in the downstream area.
National Program for Inspection of Non-Federal Dams. North Silver Lake Dam (MA 00307), Connecticut River Basin, Sandisfield, Massachusetts. Phase I Inspection Report
North Silver Dam is about 1550 feet long with a maximum height of 76 feet. The dam has a chimney drain and a rock toe for internal drainage. The dam has been classified as intermediate in size with a high hazard potential. The dam is considered to be in fair condition. A major breach of the dam could cause appreciable damage to roads, bridges and residences in the downstream area.
National Program for Inspection of Non-Federal Dams. North Silver Lake Dam (MA 00307), Connecticut River Basin, Sandisfield, Massachusetts. Phase I Inspection Report
1980
130 pages
Report
No indication
English