A platform for research: civil engineering, architecture and urbanism
Analysis of a Dredged Material Disposal Operation, Dam Neck Ocean Disposal Site, Virginia
Purpose of this study was to: (a) determine the Corps ability to construct an underwater feature utilizing predominately fine grained maintenance dredging material, and (b) enhance the Corps ability to monitor and predict the stability of the feature and its effects on surrounding topography. Conclusion arrived at was that the only loss of dredged material from the site was the direct result of settlement of scour along the crest due to various storms which passed through the area. The computed volume change was not within the error limits of state-of-the art bathymetric survey methods. (Author)
Analysis of a Dredged Material Disposal Operation, Dam Neck Ocean Disposal Site, Virginia
Purpose of this study was to: (a) determine the Corps ability to construct an underwater feature utilizing predominately fine grained maintenance dredging material, and (b) enhance the Corps ability to monitor and predict the stability of the feature and its effects on surrounding topography. Conclusion arrived at was that the only loss of dredged material from the site was the direct result of settlement of scour along the crest due to various storms which passed through the area. The computed volume change was not within the error limits of state-of-the art bathymetric survey methods. (Author)
Analysis of a Dredged Material Disposal Operation, Dam Neck Ocean Disposal Site, Virginia
S. R. DeLoach (author)
1985
18 pages
Report
No indication
English
Dredged Material Transport at Deep-Ocean Disposal Sites
British Library Conference Proceedings | 1993
|Dredged Material Accumulation at a Dispersive Disposal Site
British Library Conference Proceedings | 1994
|Confined Disposal of Dredged Material
NTIS | 1987
Dredging and Dredged Material Disposal
NTIS | 1983
Dredging and Dredged Material Disposal
NTIS | 1983