A platform for research: civil engineering, architecture and urbanism
In June 2000, the State of Alaska Department of Transportation and Public Facilities (DOT/PF) completed construction of the Whittier Access Project. One phase of this project converted the existing 2.5-mile Anton Anderson Memorial Railroad Tunnel (or Whittier Tunnel) into the world's only dual-use highway/rail tunnel with one-way reversible highway traffic. The construction project included construction of the tunnel invert (driving surface that can accommodate both highway vehicles and trains); drainage systems; three different types of ventilation systems; two vehicle staging areas; Tunnel Control Center (TCC); communication systems; portal buildings; train signal system and other safety features. The primary objective of this research project is to: 1) identify the problems affecting the train signal and rail systems and 2) develop the Scope of Services for an engineering consultant contract to determine the causes of the train signal system failures and develop solutions.
In June 2000, the State of Alaska Department of Transportation and Public Facilities (DOT/PF) completed construction of the Whittier Access Project. One phase of this project converted the existing 2.5-mile Anton Anderson Memorial Railroad Tunnel (or Whittier Tunnel) into the world's only dual-use highway/rail tunnel with one-way reversible highway traffic. The construction project included construction of the tunnel invert (driving surface that can accommodate both highway vehicles and trains); drainage systems; three different types of ventilation systems; two vehicle staging areas; Tunnel Control Center (TCC); communication systems; portal buildings; train signal system and other safety features. The primary objective of this research project is to: 1) identify the problems affecting the train signal and rail systems and 2) develop the Scope of Services for an engineering consultant contract to determine the causes of the train signal system failures and develop solutions.
Evaluation of the Train Signal and Rail Systems for the Anton Anderson Memorial Tunnel
2014
204 pages
Report
No indication
English
Railroad Transportation , Road Transportation , Highway Engineering , Transportation , Tunnels , Rail transportation , Highways , Traffic signals , Evaluation , Railroad tracks , Research project , Subdrains , Trains , Transportation safety , Ventilation systems , Alaska , Communication systems , Construction , Corrosion , Drainage , Anton Anderson Memorial Tunnel
Design of the Reconstruction of the Anton Anderson Memorial Tunnel
British Library Conference Proceedings | 2002
|Water and Ice Control in the Anton Anderson Memorial Tunnel, Whittier, Alaska
British Library Conference Proceedings | 2002
|Rehabilitation of the Anderson Memorial Bridge
ASCE | 2014
|Rehabilitation of the Anderson Memorial Bridge
British Library Conference Proceedings | 2014
|