Contamination Analysis Report for Environmental Contamination Survey of the Longhorn Army Ammunition Plant, Mashall, Texas
The main purpose of this interim report is the transference of analytical data to Thiokol Corporation and the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA) to allow for in-process review and focusing of the remaining geotechnical and analytical effort on those areas found to be of continued concern. At the outset of this project, nine sites within Longhorn Army Ammunition Plant were designated as potential areas of concern. These areas have been investigated geotechnically and analytically through the logging of existing soil conditions, as well as the sampling of groundwaters, surface waters, sediments, and soils at each of the study areas. The technical results associated with the geotechnical investigation have been submitted under separate cover in November 1982 as Interim Technical Report No. 1. This document contains the analytical data and field sampling methodology used for this survey. The following sections of this interim report will rely heavily on other documents previously prepared by Environmental Protection Systems, Inc. (EPS) and already submitted to Thiokol and USATHAMA.
Contamination Analysis Report for Environmental Contamination Survey of the Longhorn Army Ammunition Plant, Mashall, Texas
The main purpose of this interim report is the transference of analytical data to Thiokol Corporation and the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA) to allow for in-process review and focusing of the remaining geotechnical and analytical effort on those areas found to be of continued concern. At the outset of this project, nine sites within Longhorn Army Ammunition Plant were designated as potential areas of concern. These areas have been investigated geotechnically and analytically through the logging of existing soil conditions, as well as the sampling of groundwaters, surface waters, sediments, and soils at each of the study areas. The technical results associated with the geotechnical investigation have been submitted under separate cover in November 1982 as Interim Technical Report No. 1. This document contains the analytical data and field sampling methodology used for this survey. The following sections of this interim report will rely heavily on other documents previously prepared by Environmental Protection Systems, Inc. (EPS) and already submitted to Thiokol and USATHAMA.
Contamination Analysis Report for Environmental Contamination Survey of the Longhorn Army Ammunition Plant, Mashall, Texas
1984
311 pages
Report
No indication
English
Soil Sciences , Soil & Rock Mechanics , Solid Wastes Pollution & Control , Water Pollution & Control , Ammunition, Explosives, & Pyrotechnics , Ground water , Soils , Surface waters , Environmental protection , Sediments , Contamination , Sampling , Methodology , Ammunition , Environments , Surveys , Texas , Army facilities , Field tests
Europe - Swiss Army site contamination survey
Online Contents | 2000
TIBKAT | 1982
|Radon Testing at Radford Army Ammunition Plant
NTIS | 1992
|Environmental Lead Contamination:
Emerald Group Publishing | 1994
|