A platform for research: civil engineering, architecture and urbanism
Site-Specific Health and Safety Plan, 233-S Decontamination and Decommissioning
The 233-S Facility operated from January 1952 until July 1967, at which time the building entered the U.S. Department of Energy's Surplus Facility Management Program as a retired facility. The facility has since undergone severe degradation due to exposure to extreme weather conditions. A freeze and thaw cycle occurred at the Hanford Site during February 1996, which caused cracking failure of portions of the building roof. This resulted in significant infiltration of water into the facility, which creates a pathway for potential release of radioactive material into the environment (air and/or ground). Additionally, the weather caused existing cracks in concrete structures of the building to lengthen, thereby increasing the potential for failed confinement of the building's radioactive material. Differential settlement has also occurred, causing portions of the facility to separate from the main building structure, increasing the potential for release of radioactive material to the environment. An expedited response is proposed to remove this threat and ensure protection of human health and the environment.
Site-Specific Health and Safety Plan, 233-S Decontamination and Decommissioning
The 233-S Facility operated from January 1952 until July 1967, at which time the building entered the U.S. Department of Energy's Surplus Facility Management Program as a retired facility. The facility has since undergone severe degradation due to exposure to extreme weather conditions. A freeze and thaw cycle occurred at the Hanford Site during February 1996, which caused cracking failure of portions of the building roof. This resulted in significant infiltration of water into the facility, which creates a pathway for potential release of radioactive material into the environment (air and/or ground). Additionally, the weather caused existing cracks in concrete structures of the building to lengthen, thereby increasing the potential for failed confinement of the building's radioactive material. Differential settlement has also occurred, causing portions of the facility to separate from the main building structure, increasing the potential for release of radioactive material to the environment. An expedited response is proposed to remove this threat and ensure protection of human health and the environment.
Site-Specific Health and Safety Plan, 233-S Decontamination and Decommissioning
B. J. Hobbs (author)
1998
36 pages
Report
No indication
English