A platform for research: civil engineering, architecture and urbanism
Cost Estimate of Grouting the Proposed Test Pits at Idaho National Engineering Laboratory Using the ORNL-Recommended Grouts
EG and G Idaho will construct three experimental pits to simulate the TRU waste trenches at Idaho National Engineering Laboratory (INEL). Two of these pits will be grouted and then one will be destructively examined as soon as the grout cures and the other will be monitored for 10 years. Oak Ridge National Laboratory (ORNL) is evaluating grouts and will recommend a grout to EG and G Idaho to reduce the permeability of the pit, fill the large voids, and encapsulate the waste. A previous ORNL report (ORNL/TM-9881) discusses the grouts evaluated and the grout recommended based on those evaluations. This report evaluates the economics of grouting the experimental pits. The cost of double grouting two of the EG and G Idaho design pits at the Idaho National Engineering Laboratory using lance injection was estimated to be $100,000. Jet grouting the same two pits was estimated to cost $85,000. Both should be tried as part of the test EG and G Idaho is conducting. (ERA citation 13:000360)
Cost Estimate of Grouting the Proposed Test Pits at Idaho National Engineering Laboratory Using the ORNL-Recommended Grouts
EG and G Idaho will construct three experimental pits to simulate the TRU waste trenches at Idaho National Engineering Laboratory (INEL). Two of these pits will be grouted and then one will be destructively examined as soon as the grout cures and the other will be monitored for 10 years. Oak Ridge National Laboratory (ORNL) is evaluating grouts and will recommend a grout to EG and G Idaho to reduce the permeability of the pit, fill the large voids, and encapsulate the waste. A previous ORNL report (ORNL/TM-9881) discusses the grouts evaluated and the grout recommended based on those evaluations. This report evaluates the economics of grouting the experimental pits. The cost of double grouting two of the EG and G Idaho design pits at the Idaho National Engineering Laboratory using lance injection was estimated to be $100,000. Jet grouting the same two pits was estimated to cost $85,000. Both should be tried as part of the test EG and G Idaho is conducting. (ERA citation 13:000360)
Cost Estimate of Grouting the Proposed Test Pits at Idaho National Engineering Laboratory Using the ORNL-Recommended Grouts
R. D. Spence (author)
1987
32 pages
Report
No indication
English
Idaho National Engineering Laboratory, Idaho
British Library Conference Proceedings | 1995
|Idaho National Engineering Laboratory annual report
NTIS | 1989
|Fracture grouting of sand by microfine cement grouts
British Library Online Contents | 2009
|