A platform for research: civil engineering, architecture and urbanism
Maintenance Dredging, Bronx River, New York
The project involves dredging the Federal channel and turning basin in the Bronx River to authorized project dimensions. Disposal of the excavated material would be in an appproved dumping area in the New York Bight. Environmental impacts include excavation and disposal of about 83,000 cubic yards of bottom materials. Adverse environmental effects include construction disturbance due to disruption of channel bottom on associated life, generation of turbidity, and diiposal of excavated material at the already degraded approved dumping area in the New York Bight.
Maintenance Dredging, Bronx River, New York
The project involves dredging the Federal channel and turning basin in the Bronx River to authorized project dimensions. Disposal of the excavated material would be in an appproved dumping area in the New York Bight. Environmental impacts include excavation and disposal of about 83,000 cubic yards of bottom materials. Adverse environmental effects include construction disturbance due to disruption of channel bottom on associated life, generation of turbidity, and diiposal of excavated material at the already degraded approved dumping area in the New York Bight.
Maintenance Dredging, Bronx River, New York
1972
18 pages
Report
No indication
English