A platform for research: civil engineering, architecture and urbanism
Operation Breakthrough: Site Planning-Indianapolis, Indiana
The organization of the report is based on the planners four major task areas: site analysis and conceptual planning, housing system analysis and preliminary planning, contract document development, and inspection and coordination during construction. The report includes plans, graphics, photos and marrative which illustrate the quality of the work accomplished and the overall site design and landscape elements. (Author
Operation Breakthrough: Site Planning-Indianapolis, Indiana
The organization of the report is based on the planners four major task areas: site analysis and conceptual planning, housing system analysis and preliminary planning, contract document development, and inspection and coordination during construction. The report includes plans, graphics, photos and marrative which illustrate the quality of the work accomplished and the overall site design and landscape elements. (Author
Operation Breakthrough: Site Planning-Indianapolis, Indiana
1972
58 pages
Report
No indication
English
Indianapolis Speedway, Indiana
British Library Online Contents | 2002
|British Library Online Contents | 2011
HIGH-RISE ROPE RESCUES, INDIANAPOLIS, INDIANA
British Library Online Contents | 2008
|The CineDome at the Children's Museum, Indianapolis, Indiana
British Library Online Contents | 1997