A platform for research: civil engineering, architecture and urbanism
Quality Assurance Specification Review for Hot Mix Asphalt and Structural Concrete
This report includes three parts: 1. Final Report for Quality Assurance Specifications Review dated May 2000, 2. Addendum to the Final Report dated December 2000, and 3. Draft Construction Manual and Inspection Guidelines dated May 2000. The study tasks included a detailed analysis of the QA special provision, evaluation of Department and Contractors risks, examination of practice of using Contractors tests results for acceptance, guidelines for effective use of QA specifications by field inspection staff, need for adjustments to material specification limits, interviews with Department and Contractor personnel and the impact of recommended changes to the Contractors. The recommendations emphasize implementation of a new pay factor equation that better balances Department and Contractor risks, training must be a priority, improved process control, inadequate staffing, increasing in-place HMA density measurements, and using percent within limits for concrete acceptance plan. In general, QA implementation is going well. Implementation of Superpave and QA specifications simultaneously has created a few challenges.
Quality Assurance Specification Review for Hot Mix Asphalt and Structural Concrete
This report includes three parts: 1. Final Report for Quality Assurance Specifications Review dated May 2000, 2. Addendum to the Final Report dated December 2000, and 3. Draft Construction Manual and Inspection Guidelines dated May 2000. The study tasks included a detailed analysis of the QA special provision, evaluation of Department and Contractors risks, examination of practice of using Contractors tests results for acceptance, guidelines for effective use of QA specifications by field inspection staff, need for adjustments to material specification limits, interviews with Department and Contractor personnel and the impact of recommended changes to the Contractors. The recommendations emphasize implementation of a new pay factor equation that better balances Department and Contractor risks, training must be a priority, improved process control, inadequate staffing, increasing in-place HMA density measurements, and using percent within limits for concrete acceptance plan. In general, QA implementation is going well. Implementation of Superpave and QA specifications simultaneously has created a few challenges.
Quality Assurance Specification Review for Hot Mix Asphalt and Structural Concrete
C. S. Hughes (author) / B. M. Killingsworth (author)
2000
142 pages
Report
No indication
English
Performance Review of a Quality Control/Quality Assurance Specification for Asphalt Concrete
British Library Online Contents | 1999
|Performance Review of a Quality Control/Quality Assurance Specification for Asphalt Concrete
British Library Conference Proceedings | 1999
|Mechanistic Quality Control/quality Assurance Evaluation of Asphalt Concrete Mixes
British Library Conference Proceedings | 1997
|British Library Online Contents | 2010
|