A platform for research: civil engineering, architecture and urbanism
Choptank River Dredged Material Placement Study. Interim Report
This report represents a segment of the Study draft final report and describes the ten year dredged material placement (DMP) plan which was developed for selected dredging projects.
Choptank River Dredged Material Placement Study. Interim Report
This report represents a segment of the Study draft final report and describes the ten year dredged material placement (DMP) plan which was developed for selected dredging projects.
Choptank River Dredged Material Placement Study. Interim Report
1980
97 pages
Report
No indication
English
Dredging and dredged material placement
TIBKAT | 2022
|Nearshore Placement Techniques for Dredged Material
British Library Conference Proceedings | 1988
|Management of Dredged Material Placement Operations
British Library Conference Proceedings | 1994
|