A platform for research: civil engineering, architecture and urbanism
Continuously Reinforced Concrete Pavement
Nine and forty-five hundredths miles of continuously reinforced, anchored concrete pavement were observed and measured for movement of the pavement ends, and joints 126 ft.-6 in. and 320 ft.-6 in. from the end. Cracks and joints were measured for the amount of opening. Six test sections were surveyed and cracks were measured for frequency. This evaluation of the concrete pavement continued for six years. (Author)
Continuously Reinforced Concrete Pavement
Nine and forty-five hundredths miles of continuously reinforced, anchored concrete pavement were observed and measured for movement of the pavement ends, and joints 126 ft.-6 in. and 320 ft.-6 in. from the end. Cracks and joints were measured for the amount of opening. Six test sections were surveyed and cracks were measured for frequency. This evaluation of the concrete pavement continued for six years. (Author)
Continuously Reinforced Concrete Pavement
J. C. Jenkins (author) / C. R. Chandler (author)
1970
40 pages
Report
No indication
English
Continuously reinforced concrete pavement
TIBKAT | 1973
|Continuously-reinforced concrete pavement
Engineering Index Backfile | 1963
Continuously reinforced concrete pavement
UB Braunschweig | 1973
|Continuously Reinforced Concrete Pavement Performance
NTIS | 1968
|