A platform for research: civil engineering, architecture and urbanism
Field Verification of the Estuarine Plant Bioassay Procedure
This note summarizes results of field testing and verification of plant bioassay procedures developed under the Long-Term Effects of Dredging Operations (LEDO) Program. The verification work was conducted as part of the Interagency Field Verification of Testing and Predictive Methodologies for Dredged Material Disposal Alternatives called the Field Verification Program (FVP).
Field Verification of the Estuarine Plant Bioassay Procedure
This note summarizes results of field testing and verification of plant bioassay procedures developed under the Long-Term Effects of Dredging Operations (LEDO) Program. The verification work was conducted as part of the Interagency Field Verification of Testing and Predictive Methodologies for Dredged Material Disposal Alternatives called the Field Verification Program (FVP).
Field Verification of the Estuarine Plant Bioassay Procedure
B. L. Folsom (author) / R. M. Englar (author)
1987
7 pages
Report
No indication
English
Field Data Collection and Analysis for Verification of Estuarine Models
British Library Conference Proceedings | 1996
|Procedure to Calibrate and Verify Numerical Models of Estuarine Hydrodynamics
British Library Online Contents | 1999
|TECHNICAL PAPERS - Procedure to Calibrate and Verify Numerical Models of Estuarine Hydrodynamics
Online Contents | 1999
|British Library Conference Proceedings | 2001
|Preliminary Verification of a 3D Hydrodynamic Model of the San Juan Estuarine System
British Library Conference Proceedings | 1997
|