A platform for research: civil engineering, architecture and urbanism
INEL Mixed and Low-Level Waste Disposal Facility environmental compliance plan and schedule
The Mixed and Low-Level Waste Disposal Facility (MLLWDF) project was established in 1991 by the US Department of Energy (DOE) Idaho Field Office to provide long-term disposal needs for Idaho National Engineering Laboratory low-level mixed waste and low-level waste. A survey of Federal, State of Idaho, and DOE environmental protection regulations and standards was completed for the proposed MLLWDF. The purpose of this survey was to identify permitting and documentation requirements applicable to the siting, construction, and operation of the new facility. Permitting and regulatory documentation requirements for the MLLWDF are based on National Environmental Policy Act, Clean Air Act, Clean Water Act, Resource Conservation and Recovery Act, and Idaho Administrative Procedures Act regulations and DOE orders. The applicable permits and requirements are summarized, and a schedule relating project phases to permitting timeframes is included.
INEL Mixed and Low-Level Waste Disposal Facility environmental compliance plan and schedule
The Mixed and Low-Level Waste Disposal Facility (MLLWDF) project was established in 1991 by the US Department of Energy (DOE) Idaho Field Office to provide long-term disposal needs for Idaho National Engineering Laboratory low-level mixed waste and low-level waste. A survey of Federal, State of Idaho, and DOE environmental protection regulations and standards was completed for the proposed MLLWDF. The purpose of this survey was to identify permitting and documentation requirements applicable to the siting, construction, and operation of the new facility. Permitting and regulatory documentation requirements for the MLLWDF are based on National Environmental Policy Act, Clean Air Act, Clean Water Act, Resource Conservation and Recovery Act, and Idaho Administrative Procedures Act regulations and DOE orders. The applicable permits and requirements are summarized, and a schedule relating project phases to permitting timeframes is included.
INEL Mixed and Low-Level Waste Disposal Facility environmental compliance plan and schedule
M. J. Jorgenson-Waters (author)
1992
49 pages
Report
No indication
English
Radiation Pollution & Control , Radioactive Wastes & Radioactivity , Environmental Policy , Low-Level Radioactive Wastes , Compliance , Ground Disposal , Hazardous Materials , Idaho , Idaho National Engineering Laboratory , Permits , Planning , Radioactive Waste Disposal , Radioactive Waste Facilities , Regulations , Tanks , US Clean Air Act , EDB/052002 , EDB/290300
NTIS | 1995
|INEL Lithologic Core Storage Library management plan
NTIS | 1990
|NTIS | 1993
|