A platform for research: civil engineering, architecture and urbanism
National Dam Inspection Program. Birch Run Reservoir Dam (NDS ID Number 329), Potomac River Basin, Conococheague Creek, Adams County, Pennsylvania. Phase I Inspection Report
The Dam Inspection Act, Public Law 92-237 (Appendix III) authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of safety inspections of dams throughout the United States. Phase I Inspection and Report is limited to a review of available data, a visual inspection of the dam site and the basic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.
National Dam Inspection Program. Birch Run Reservoir Dam (NDS ID Number 329), Potomac River Basin, Conococheague Creek, Adams County, Pennsylvania. Phase I Inspection Report
The Dam Inspection Act, Public Law 92-237 (Appendix III) authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of safety inspections of dams throughout the United States. Phase I Inspection and Report is limited to a review of available data, a visual inspection of the dam site and the basic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.
National Dam Inspection Program. Birch Run Reservoir Dam (NDS ID Number 329), Potomac River Basin, Conococheague Creek, Adams County, Pennsylvania. Phase I Inspection Report
1978
53 pages
Report
No indication
English