A platform for research: civil engineering, architecture and urbanism
Evaluation of the Southwest Freeway Motorist Assistance Program in Houston
The Houston Motorist Assistance Program (MAP) assigned two vans to patrol the U.S. 59 Southwest Freeway during the reconstruction projects. These patrols operated from about July 1991 until the majority of the construction was completed in September 1992. The report evaluates the benefits that this program produced during a one-year period.
Evaluation of the Southwest Freeway Motorist Assistance Program in Houston
The Houston Motorist Assistance Program (MAP) assigned two vans to patrol the U.S. 59 Southwest Freeway during the reconstruction projects. These patrols operated from about July 1991 until the majority of the construction was completed in September 1992. The report evaluates the benefits that this program produced during a one-year period.
Evaluation of the Southwest Freeway Motorist Assistance Program in Houston
P. A. Hawkins (author)
1993
38 pages
Report
No indication
English
Motorist Interpretation of MUTCD Freeway Lane Control Signals
British Library Online Contents | 1993
|British Library Online Contents | 1998
|Effect of Freeway Corridor Attributes on Motorist Diversion Responses to Travel Time Information
British Library Online Contents | 1994
|Motorist Interpretation of Yellow X and Yellow Diagonal Arrow in Freeway Lane Control Signal Array
British Library Online Contents | 1995
|