A platform for research: civil engineering, architecture and urbanism
Wastewater Treatment Feasibility Study: Task 1 (El Palito Refinery)
The study assesses the existing infrastructure and treatment needs for the waste water treatment plant at the El Palito Refinery, built between 1958 through 1960. The study addresses the following points: (1) New activated sludge system; (2) Replaced aeration lagoons; (3) New API separator and dissolved air flotation (DAF) units. This is Task 1, the first volume of a four volume set and it has texts in both English and Spanish.
Wastewater Treatment Feasibility Study: Task 1 (El Palito Refinery)
The study assesses the existing infrastructure and treatment needs for the waste water treatment plant at the El Palito Refinery, built between 1958 through 1960. The study addresses the following points: (1) New activated sludge system; (2) Replaced aeration lagoons; (3) New API separator and dissolved air flotation (DAF) units. This is Task 1, the first volume of a four volume set and it has texts in both English and Spanish.
Wastewater Treatment Feasibility Study: Task 1 (El Palito Refinery)
1998
118 pages
Report
No indication
English
Water Pollution & Control , Foreign Industry Economic Development , Fuels , Petroleum refineries , Industrial waste treatment , Venezuela , Water pollution control , Activated sludge process , Infrastructure , Aeration , Aeration ponds , Separation , Flotation , Management planning , Economic development , Technical assistance
Evaluation of Offshore Penetration Tests at El Palito Refinery
British Library Conference Proceedings | 1995
|Refinery wastewater treatment and reuse
Tema Archive | 1976
|Selenium Treatment in Refinery Wastewater
British Library Conference Proceedings | 2012
|ADVANCED FILTRATION IN REFINERY WASTEWATER TREATMENT PROCESS
TIBKAT | 2021
|