A platform for research: civil engineering, architecture and urbanism
Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft
This report presents the results of a specific site assessment of the dam safety of Flue Gas Desulphurization (FGD) Pond 1 embankment dam FGD Pond 2 embankment dam at the PacifiCorp Energy Jim Bridger Power Station in Point of Rocks, Wyoming. The specific site assessment was conducted on June 9 and 10, 2009.
Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft
This report presents the results of a specific site assessment of the dam safety of Flue Gas Desulphurization (FGD) Pond 1 embankment dam FGD Pond 2 embankment dam at the PacifiCorp Energy Jim Bridger Power Station in Point of Rocks, Wyoming. The specific site assessment was conducted on June 9 and 10, 2009.
Specific Site Assessment for Coal Ash Impoundments at PacifiCorp Energy, Jim Bridger Power Station, Point of Rocks, Wyoming. Draft
2009
42 pages
Report
No indication
English
Solid Wastes Pollution & Control , Air Pollution & Control , Environmental Studies , Environmental Management & Planning , Environment , Dam safety , Waste management , Surface impoundments , Coal ash impoundment , Site assessments , Recommendations , Construction , Operations , Seismology , Geology , Instrumentation , Structural stability , Maintenance , Operation methods , Ash ponds , Field assessments , Wyoming , Impoundment embankment dams , Jim Bridger Power Station , PacifiCorp Energy , Spillway adequacy , Emergency action plans , Point of Rocks(Wyoming)
Risk Assessment Approach for Coal Ash Impoundments
British Library Conference Proceedings | 2015
|