A platform for research: civil engineering, architecture and urbanism
Brief Reconnaissance Study for the Addition of Hydropower for Glendale Mill Dam, Glendale, South Carolina
The feasibility of retrofitting the Glendale Mill Dam near Glendale, SC for power generation was examined. This dam with a developable head of 14 ft was built in 1904 to power a now abandoned mill. A study of the environmental, safety, institutional and economic factors associated with hydropower development at this site showed that the total investment costs would be $643,000 with $20,000 for operating costs during the first year. Therefore, development of this site is not recommended. (ERA citation 07:046131)
Brief Reconnaissance Study for the Addition of Hydropower for Glendale Mill Dam, Glendale, South Carolina
The feasibility of retrofitting the Glendale Mill Dam near Glendale, SC for power generation was examined. This dam with a developable head of 14 ft was built in 1904 to power a now abandoned mill. A study of the environmental, safety, institutional and economic factors associated with hydropower development at this site showed that the total investment costs would be $643,000 with $20,000 for operating costs during the first year. Therefore, development of this site is not recommended. (ERA citation 07:046131)
Brief Reconnaissance Study for the Addition of Hydropower for Glendale Mill Dam, Glendale, South Carolina
T. G. Gebhard (author)
1980
18 pages
Report
No indication
English
Circolo Restaurant - Glendale, California . ROTOndi
Online Contents | 1993
Glendale Boulevard Corridor Study
Online Contents | 1995
Sanitary sewer system, glendale, cal
Engineering Index Backfile | 1926
|How Glendale, Arizona, settled dust
Engineering Index Backfile | 1948
|