A platform for research: civil engineering, architecture and urbanism
Pavement Deflection Measurement-Dynamic. Phase II
Implementation of automatic data acquisition using impulse testing requires the development of a mechanical device to set an instrument package on the pavement, deliver an impulse of energy, and retrieve the instrument package. This is to be done automatically with the vehicle proceeding down the highway. This report describes a test model built to facilitate the determination of data necessary to design a prototype vehicle. (Author)
Pavement Deflection Measurement-Dynamic. Phase II
Implementation of automatic data acquisition using impulse testing requires the development of a mechanical device to set an instrument package on the pavement, deliver an impulse of energy, and retrieve the instrument package. This is to be done automatically with the vehicle proceeding down the highway. This report describes a test model built to facilitate the determination of data necessary to design a prototype vehicle. (Author)
Pavement Deflection Measurement-Dynamic. Phase II
F. Brands (author) / J. C. Cook (author)
1971
40 pages
Report
No indication
English
Pavement Deflection Measurement - Dynamic
NTIS | 1975
|NTIS | 1981
|Accurate measurement of pavement deflection velocity under dynamic loads
British Library Online Contents | 2017
|