A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Buck Street East Dam (NH 00445), NHWRB Number 190.06, Merrimack River Basin, Pembroke, New Hampshire. Phase I Inspection Report
Buck Street East Dam is a composite structure consisting of cut-granite masonry and concrete with an overall length of approximately 53.5 ft. and a maximum structural height of about 11.75 ft. The visual inspection indicated that the dam was in generally good condition. It is small in size with a low hazard potential. It is recommended that provisions be made by the owner to repair the scoured concrete portion of the outlet works sluiceway structure and to remove the debris from the upstream face of the dam.
National Program for Inspection of Non-Federal Dams. Buck Street East Dam (NH 00445), NHWRB Number 190.06, Merrimack River Basin, Pembroke, New Hampshire. Phase I Inspection Report
Buck Street East Dam is a composite structure consisting of cut-granite masonry and concrete with an overall length of approximately 53.5 ft. and a maximum structural height of about 11.75 ft. The visual inspection indicated that the dam was in generally good condition. It is small in size with a low hazard potential. It is recommended that provisions be made by the owner to repair the scoured concrete portion of the outlet works sluiceway structure and to remove the debris from the upstream face of the dam.
National Program for Inspection of Non-Federal Dams. Buck Street East Dam (NH 00445), NHWRB Number 190.06, Merrimack River Basin, Pembroke, New Hampshire. Phase I Inspection Report
1979
81 pages
Report
No indication
English