A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Yantic River Dam (CT 00654), Thames River Basin, Bozrah, Connecticut. Phase I Inspection Report
The Yantic River Dam is an earth embankment with a gravity overflow section. They have a combined length of approximately 323 feet and a maximum height of 18.2 feet. A spillway is located on the northern side of the dam and is approximately 128 feet long. The concrete and masonry spillway is 4 feet lower than the top of the dam. A gate structure and sluiceway near the northern end of the dam supplies water to a downstream factory. There is a 24 inch low-level discharge pipe that passes through the base of the dam at the southern end of the spillway. The pipe is controlled by a gate on the upstream side of the dam and this gate is operable. The drainage area is 39.4 square miles and the reservoir has approximately 77 acre-feet of storage capacity. The assessment of the dam is based on available information, visual inspection and hydraulic/hydrologic computations. The dam is judged to be in FAIR condition with several areas that require attention. These areas include: seepage through the earth embankment and the northern spillway training wall, settlement behind the spillway training wall, cracking and spalling of the sluiceway gate structure and brush and trees on the embankments and along the toe of the dam. The spillway capacity at the top of dam is 2,700 cfs or 44 percent of the test flood outflow. The test flood outflow will overtop the dam by approximately 2 feet.
National Program for Inspection of Non-Federal Dams. Yantic River Dam (CT 00654), Thames River Basin, Bozrah, Connecticut. Phase I Inspection Report
The Yantic River Dam is an earth embankment with a gravity overflow section. They have a combined length of approximately 323 feet and a maximum height of 18.2 feet. A spillway is located on the northern side of the dam and is approximately 128 feet long. The concrete and masonry spillway is 4 feet lower than the top of the dam. A gate structure and sluiceway near the northern end of the dam supplies water to a downstream factory. There is a 24 inch low-level discharge pipe that passes through the base of the dam at the southern end of the spillway. The pipe is controlled by a gate on the upstream side of the dam and this gate is operable. The drainage area is 39.4 square miles and the reservoir has approximately 77 acre-feet of storage capacity. The assessment of the dam is based on available information, visual inspection and hydraulic/hydrologic computations. The dam is judged to be in FAIR condition with several areas that require attention. These areas include: seepage through the earth embankment and the northern spillway training wall, settlement behind the spillway training wall, cracking and spalling of the sluiceway gate structure and brush and trees on the embankments and along the toe of the dam. The spillway capacity at the top of dam is 2,700 cfs or 44 percent of the test flood outflow. The test flood outflow will overtop the dam by approximately 2 feet.
National Program for Inspection of Non-Federal Dams. Yantic River Dam (CT 00654), Thames River Basin, Bozrah, Connecticut. Phase I Inspection Report
1981
65 pages
Report
No indication
English