A platform for research: civil engineering, architecture and urbanism
Bridge Deck Service Life Prediction and Costs
The service life of Virginias concrete bridge decks is generally controlled by chloride-induced corrosion of the reinforcing steel as a result of the application of winter maintenance deicing salts. A chloride corrosion model accounting for the variable input parameters using Monte Carlo resampling was developed. The model was validated using condition surveys from 10 Virginia bridge decks built with bare steel. The influence of changes in the construction specifications of w/c = 0.47 and 0.45 and w/cm = 0.45 and a cover depth increase from 2 to 2.75 inches was determined. Decks built under the specification of w/cm = 0.45 (using slag or fly ash) and a 2.75 inch cover depth have a maintenance free service life of greater than 100 years, regardless of the type of reinforcing steel. Galvanized, MMFX-2, and stainless steel, in order of increasing reliability of a service life of greater than 100 years, will provide a redundant corrosion protection system. Life cycle cost analyses were conducted for polymer concrete and portland cement based overlays as maintenance activities. The most economical alternative is dependent on individual structure conditions. The study developed a model and computer software that can be used to determine the time to first repair and rehabilitation of individual bridge decks taking into account the time for corrosion initiation, time from initiation to cracking, and time for corrosion damage to propagate to a state requiring repair.
Bridge Deck Service Life Prediction and Costs
The service life of Virginias concrete bridge decks is generally controlled by chloride-induced corrosion of the reinforcing steel as a result of the application of winter maintenance deicing salts. A chloride corrosion model accounting for the variable input parameters using Monte Carlo resampling was developed. The model was validated using condition surveys from 10 Virginia bridge decks built with bare steel. The influence of changes in the construction specifications of w/c = 0.47 and 0.45 and w/cm = 0.45 and a cover depth increase from 2 to 2.75 inches was determined. Decks built under the specification of w/cm = 0.45 (using slag or fly ash) and a 2.75 inch cover depth have a maintenance free service life of greater than 100 years, regardless of the type of reinforcing steel. Galvanized, MMFX-2, and stainless steel, in order of increasing reliability of a service life of greater than 100 years, will provide a redundant corrosion protection system. Life cycle cost analyses were conducted for polymer concrete and portland cement based overlays as maintenance activities. The most economical alternative is dependent on individual structure conditions. The study developed a model and computer software that can be used to determine the time to first repair and rehabilitation of individual bridge decks taking into account the time for corrosion initiation, time from initiation to cracking, and time for corrosion damage to propagate to a state requiring repair.
Bridge Deck Service Life Prediction and Costs
G. Williamson (author) / R. E. Weyers (author) / M. C. Brown (author) / M. M. Sprinkel (author)
2007
79 pages
Report
No indication
English
Highway Engineering , Transportation & Traffic Planning , Road Transportation , Transportation , Service life , Bridge decks , Life cycle costs , Bridges (Structures) , Predictions , Costs , Computer software , Virginia , Construction specifications , Bridge surfaces , Concrete bridge decks , Chloride corrosion model , Polymer concrete , Portland cement based overlays , Monte Carlo resampling
Software for Analyzing Bridge Deck Life-Cycle Costs
British Library Conference Proceedings | 1998
|New type deck cuts bridge costs
Engineering Index Backfile | 1966
Bridge deck built for long life
Engineering Index Backfile | 1956