A platform for research: civil engineering, architecture and urbanism
Data report on the Waste Isolation Pilot Plant Small-Scale Seal Performance Test, Series F grouting experiment
SSSPT-F was designed to evaluate sealing materials at WIPP. It demonstrated: (1) the ability to practically and consistently produce ultrafine cementitious grout at the grouting site, (2) successful, consistent, and efficient injection and permeation of the grout into fractured rock at the repository horizon, (3) ability of the grout to penetrate and seal microfractures, (4) procedures and equipment used to inject the grout. Also techniques to assess the effectiveness of the grout in reducing the gas transmissivity of the fractured rock were evaluated. These included gas-flow/tracer testing, post-grout coring, pre- and post-grout downhole televiewer logging, slab displacement measurements, and increased loading on jacks during grout injection. Pre- and post-grout diamond drill core was obtained for use in ongoing evaluations of grouting effectiveness, degradation, and compatibility. Diamond drill equipment invented for this test successfully prevented drill cuttings from plugging fractures in grout injection holes.
Data report on the Waste Isolation Pilot Plant Small-Scale Seal Performance Test, Series F grouting experiment
SSSPT-F was designed to evaluate sealing materials at WIPP. It demonstrated: (1) the ability to practically and consistently produce ultrafine cementitious grout at the grouting site, (2) successful, consistent, and efficient injection and permeation of the grout into fractured rock at the repository horizon, (3) ability of the grout to penetrate and seal microfractures, (4) procedures and equipment used to inject the grout. Also techniques to assess the effectiveness of the grout in reducing the gas transmissivity of the fractured rock were evaluated. These included gas-flow/tracer testing, post-grout coring, pre- and post-grout downhole televiewer logging, slab displacement measurements, and increased loading on jacks during grout injection. Pre- and post-grout diamond drill core was obtained for use in ongoing evaluations of grouting effectiveness, degradation, and compatibility. Diamond drill equipment invented for this test successfully prevented drill cuttings from plugging fractures in grout injection holes.
Data report on the Waste Isolation Pilot Plant Small-Scale Seal Performance Test, Series F grouting experiment
E. H. Ahrens (author) / T. F. Dale (author) / R. S. Van Pelt (author)
1996
341 pages
Report
No indication
English
Waste isolation pilot plant shaft seal salt consolidation modeling
British Library Conference Proceedings | 2000
|Review of the Waste Isolation Pilot Plant Performance Assessment
British Library Conference Proceedings | 1998
|