100 Areas technical activities report -- Physics, October 1946
The D Pile was down five times for scheduled shutdowns. The fifth shutdown was of short duration for the purpose of discharging temporary ''P'' columns. Details of the shutdowns are given. Three new bismuth columns were established, Special Requests were charged into seven tubes and three Special Requests were discharged. Three tubes were charged with four-inch slugs. The power level of the F Pile has been corrected for the discrepancy noted last month. Material for irradiation under the Special Request program was charged into six tubes and the B experimental hole during the month. The effect of poison columns and rods on the temperature distribution of the pile was checked for the overall content of the pile. The F Pile gained two in hours in cold, clean reactivity during the month if allowance is made for xenon poison values corresponding to 190 MW for the beginning of the month and 200 MW at the end of the month. The graphite stringer removed from the ''D'' test hole of the D Pile on 3-12-46 was studied physical radiation effects.
100 Areas technical activities report -- Physics, October 1946
The D Pile was down five times for scheduled shutdowns. The fifth shutdown was of short duration for the purpose of discharging temporary ''P'' columns. Details of the shutdowns are given. Three new bismuth columns were established, Special Requests were charged into seven tubes and three Special Requests were discharged. Three tubes were charged with four-inch slugs. The power level of the F Pile has been corrected for the discrepancy noted last month. Material for irradiation under the Special Request program was charged into six tubes and the B experimental hole during the month. The effect of poison columns and rods on the temperature distribution of the pile was checked for the overall content of the pile. The F Pile gained two in hours in cold, clean reactivity during the month if allowance is made for xenon poison values corresponding to 190 MW for the beginning of the month and 200 MW at the end of the month. The graphite stringer removed from the ''D'' test hole of the D Pile on 3-12-46 was studied physical radiation effects.
100 Areas technical activities report -- Physics, October 1946
P. F. Gast (author)
1946
6 pages
Report
No indication
English
Reactor Engineering & Nuclear Power Plants , Reactor Physics , Materials Degradation & Fouling , Carbon & Graphite , Graphite , Hanford Production Reactors , Fuel Elements , Inhours , Moderators , Nuclear Poisons , Physical Radiation Effects , Reactivity , Reactor Experimental Facilities , Reactor Fueling , Reactor Operation , Reactor Shutdown , EDB/220600 , EDB/210300 , EDB/360605