A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Mascoma Dam, (NH 00155), NHWRB 134.09, Connecticut River Basin, Lebanon, New Hampshire. Phase I Inspection Report
The dam consists of two overflow type spillway sections separated by a waste gate structure. It is small in size with a high hazard potential. It is in poor condition at the present time. Further investigations are recommended to evaluate the condition of the timber crib spillway section and the waste gate structure. There are various remedial measures which should be undertaken by the owner. (Author)
National Program for Inspection of Non-Federal Dams. Mascoma Dam, (NH 00155), NHWRB 134.09, Connecticut River Basin, Lebanon, New Hampshire. Phase I Inspection Report
The dam consists of two overflow type spillway sections separated by a waste gate structure. It is small in size with a high hazard potential. It is in poor condition at the present time. Further investigations are recommended to evaluate the condition of the timber crib spillway section and the waste gate structure. There are various remedial measures which should be undertaken by the owner. (Author)
National Program for Inspection of Non-Federal Dams. Mascoma Dam, (NH 00155), NHWRB 134.09, Connecticut River Basin, Lebanon, New Hampshire. Phase I Inspection Report
1980
91 pages
Report
No indication
English