A platform for research: civil engineering, architecture and urbanism
US-50 in Emporia, From Graphic Arts Road thence Southeasterly, 1.1 Miles to Prairie Street, Kansas
The report describes the improvement of the existing two-lane, open ditch roadway to four lanes with flush median, curb and gutter at the outside pavement edges, and storm sewer. The alignment is along present US-50 in Emporia, beginning at Graphic Arts Road and extending 1.1 miles southeasterly to Prairie Street. The project will replace the present two-lane section, matching the existing four-lane roadways at each end of the project, providing improved service for traffic operation, no displacement of people or businesses, and bringing US-50 into compliance with the City's Master Plan.
US-50 in Emporia, From Graphic Arts Road thence Southeasterly, 1.1 Miles to Prairie Street, Kansas
The report describes the improvement of the existing two-lane, open ditch roadway to four lanes with flush median, curb and gutter at the outside pavement edges, and storm sewer. The alignment is along present US-50 in Emporia, beginning at Graphic Arts Road and extending 1.1 miles southeasterly to Prairie Street. The project will replace the present two-lane section, matching the existing four-lane roadways at each end of the project, providing improved service for traffic operation, no displacement of people or businesses, and bringing US-50 into compliance with the City's Master Plan.
US-50 in Emporia, From Graphic Arts Road thence Southeasterly, 1.1 Miles to Prairie Street, Kansas
1972
31 pages
Report
No indication
English
Experiences with ferric chloride at Emporia, Kansas
Engineering Index Backfile | 1937
|Online Contents | 1994
WINGÅRDHS - EMPORIA À MALMÖ, SUÈDE
Online Contents | 2014
Emporia, Malmö av Wingårdh Arkitektkontor. Helena Mattsson kommenterar.
Online Contents | 2012