A platform for research: civil engineering, architecture and urbanism
Channel From Apalachicola to Two Mile and Breakwater at Two Mile Apalachicola Bay, Florida
The report describes the proposal for the project which will provide a new channel and breakwater at Two Mile, Florida. Channelization will be by hydraulic dredge. A summary of adverse and beneficial environmental effects is given.
Channel From Apalachicola to Two Mile and Breakwater at Two Mile Apalachicola Bay, Florida
The report describes the proposal for the project which will provide a new channel and breakwater at Two Mile, Florida. Channelization will be by hydraulic dredge. A summary of adverse and beneficial environmental effects is given.
Channel From Apalachicola to Two Mile and Breakwater at Two Mile Apalachicola Bay, Florida
1972
18 pages
Report
No indication
English
Apalachicola River Basin project
Engineering Index Backfile | 1956
|The Apalachicola River Basin Project
ASCE | 2021
|Spillway and lock approach Jim Woodruff dam Apalachicola river, Florida
Engineering Index Backfile | 1952
Floating fish camps on the Apalachicola River, Florida: Increases and Implications
BASE | 2018
|