A platform for research: civil engineering, architecture and urbanism
Laboratory and Field Grouting Support for Project Scroll
In Project Scroll, a nuclear device was detonated at a depth of 750 ft in a vertical hole drilled in Area 19 of the U. S. Atomic Energy Commission's Nevada Test Site. The U. S. Army Engineer Waterways Experiment Station (WES) was responsible for (a) development of instrument-to-formation coupling grout mixtures embodying specified physical properties matching as closely as possible those of the formation at the Project site, (b) development of an emplacement hole stemming grout, (c) supervision of the mixing and placement of the grout mixtures, and (d) determining, on detonation date, the pertient physical properties of field-cast grout specimens representing the field-placed grout. In general, it is believed that the physical properties of the grout mixed and emplaced in the field closely matched those set forth in the design criteria. (Author)
Laboratory and Field Grouting Support for Project Scroll
In Project Scroll, a nuclear device was detonated at a depth of 750 ft in a vertical hole drilled in Area 19 of the U. S. Atomic Energy Commission's Nevada Test Site. The U. S. Army Engineer Waterways Experiment Station (WES) was responsible for (a) development of instrument-to-formation coupling grout mixtures embodying specified physical properties matching as closely as possible those of the formation at the Project site, (b) development of an emplacement hole stemming grout, (c) supervision of the mixing and placement of the grout mixtures, and (d) determining, on detonation date, the pertient physical properties of field-cast grout specimens representing the field-placed grout. In general, it is believed that the physical properties of the grout mixed and emplaced in the field closely matched those set forth in the design criteria. (Author)
Laboratory and Field Grouting Support for Project Scroll
D. M. Walley (author) / T. L. Ellis (author)
1969
23 pages
Report
No indication
English
Miscellaneous Materials , Nuclear Explosions & Devices , Grout , Test equipment , Underground explosions , Reliability , Protection , Nuclear explosions , Detonations , Explosion effects , Drilling , Design , Mixtures , Simulation , Stratigraphy , Correlation techniques , Vela Uniform , Scroll project , Formation matching grouts
Project HOBO, Grouting Support
NTIS | 1960
|Project BUCKBOARD, Grouting Support
NTIS | 1961
|Drilling and Grouting Support, Project COWBOY
NTIS | 1961
|