A platform for research: civil engineering, architecture and urbanism
Control Techniques for Pressurized Sewerage Systems
The ASCE Combined Sewer Separation Project is supported by Contract No. 14-12-29 with the Federal Water Pollution Control Administration. Task 4 of that contract relates to feasibility studies of hypothetical pressure sewerage systems. This Technical memorandum is one of the reference background inputs for the three system studies under Task 4 covering pressure control for pressurized sewerage systems. (Author)
Control Techniques for Pressurized Sewerage Systems
The ASCE Combined Sewer Separation Project is supported by Contract No. 14-12-29 with the Federal Water Pollution Control Administration. Task 4 of that contract relates to feasibility studies of hypothetical pressure sewerage systems. This Technical memorandum is one of the reference background inputs for the three system studies under Task 4 covering pressure control for pressurized sewerage systems. (Author)
Control Techniques for Pressurized Sewerage Systems
J. R. Daneker (author) / W. H. Frazel (author)
1968
31 pages
Report
No indication
English
ASCE | 2021
|Engineering Index Backfile | 1881
|Sewerage and sewerage treatment
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1931
|