A platform for research: civil engineering, architecture and urbanism
Calamity Hollow Mine Fire Project. 3. Instrumentation for Combustion Monitoring, Process Control, and Data Recording
This report is the third in a five-part series that describes the Calamity Hollow Mine Fire Project. The first report, part 1, describes the design and construction of the field installation. Part 2 will present the results of a continuous 4-month burnout operation. (Because part 2 involves the analysis of a substantial body of data, it will not be published until after publication of parts 3, 4, and 5.) This part (part 3) describes the instrumentation used to control and monitor the progress of the burnout operation. Parts 4 and 5 both deal with the closeout phase of the field demonstration. Part 4 describes the procedure used to quench the fire, and part 5 will describe the final excavation and backfilling of the heated zones. The reports in this series document the Calamity Hollow controlled burnout demonstration which showed that (1) controlled in situ combustion is a feasible method for controlling underground fires in abandoned mines, (2) the resultant thermal exhaust output is sufficient for energy utilization, and (3) water injection with fume exhaustion (WIFE) is a potentially effective method for cooling large underground fire zones. Further trials of both Burnout Control and the WIFE quenching procedure are planned.
Calamity Hollow Mine Fire Project. 3. Instrumentation for Combustion Monitoring, Process Control, and Data Recording
This report is the third in a five-part series that describes the Calamity Hollow Mine Fire Project. The first report, part 1, describes the design and construction of the field installation. Part 2 will present the results of a continuous 4-month burnout operation. (Because part 2 involves the analysis of a substantial body of data, it will not be published until after publication of parts 3, 4, and 5.) This part (part 3) describes the instrumentation used to control and monitor the progress of the burnout operation. Parts 4 and 5 both deal with the closeout phase of the field demonstration. Part 4 describes the procedure used to quench the fire, and part 5 will describe the final excavation and backfilling of the heated zones. The reports in this series document the Calamity Hollow controlled burnout demonstration which showed that (1) controlled in situ combustion is a feasible method for controlling underground fires in abandoned mines, (2) the resultant thermal exhaust output is sufficient for energy utilization, and (3) water injection with fume exhaustion (WIFE) is a potentially effective method for cooling large underground fire zones. Further trials of both Burnout Control and the WIFE quenching procedure are planned.
Calamity Hollow Mine Fire Project. 3. Instrumentation for Combustion Monitoring, Process Control, and Data Recording
L. E. Dalverny (author) / R. F. Chaiken (author) / K. E. Soroka (author)
1984
31 pages
Report
No indication
English
Palisades dam battle at Calamity point
Engineering Index Backfile | 1953
|Facing the calamity of closing Cambridge
British Library Online Contents | 2004
|AJENDA - Facing the calamity of closing Cambridge
Online Contents | 2004