Cascade Line Testing for Hanford Single-Shell HLW Tank Closure
Two proof-of-principle large-scale tests were performed to simulate the flow of grout into Hanford single-shell HLW Tanks and into cascade lines which interconnect the HLW tanks. The goal of the testing was to determine whether the HLW tank grout can enter the cascade line and solidify prior to flowing into an adjacent tank. Two tests were performed as part of this task. The tests were conducted using the Phase 2 Structural Grout, SRG2, the structural grout mix that was used during scale-up testing last year.
Cascade Line Testing for Hanford Single-Shell HLW Tank Closure
Two proof-of-principle large-scale tests were performed to simulate the flow of grout into Hanford single-shell HLW Tanks and into cascade lines which interconnect the HLW tanks. The goal of the testing was to determine whether the HLW tank grout can enter the cascade line and solidify prior to flowing into an adjacent tank. Two tests were performed as part of this task. The tests were conducted using the Phase 2 Structural Grout, SRG2, the structural grout mix that was used during scale-up testing last year.
Cascade Line Testing for Hanford Single-Shell HLW Tank Closure
J. R. Harbour (author) / C. A. Langton (author) / J. L. Siler (author) / W. L. Mhyre (author) / C. N. Shramek (author)
2004
18 pages
Report
No indication
English
Single-Shell Tank Closure Work Plan
NTIS | 1996
|6197 Hanford Review of Double-Shell Tank Construction
TIBKAT | 2015
|"Cascade closure" diverts river
Engineering Index Backfile | 1962
|Review and Application of Concrete Creep to Hanford Waste Tank Evaluation
British Library Conference Proceedings | 1995
|