A platform for research: civil engineering, architecture and urbanism
The builder worked with Building Science Corporation to design ten HERS 53 homes with ICF foundations, foam-sheathed above-grade walls, and high-efficiency furnaces with fresh air intake and jump ducts.
The builder worked with Building Science Corporation to design ten HERS 53 homes with ICF foundations, foam-sheathed above-grade walls, and high-efficiency furnaces with fresh air intake and jump ducts.
New Whole-house Solutions Case Study: Nelson Construction, Farmington, Connecticut
None (author)
2012
2 pages
Report
No indication
English
British Library Online Contents | 2011
Farmington Canal Greenway Master Plan
British Library Online Contents | 1998